Condensate pipe upgrade

2015-03-13T09:54:20+00:00

Condensate pipe upgrade This ¾” pipe is passing through the wall ‘horizontally’ and because of this, the water lying in this section of pipe was prone to freezing up in cold weather. This, in turn causes the boiler to ‘lock out’! A larger (1 ¼” pipe) was installed; this penetrated the wall at a ‘downhill’ angle to keep the condensate water constantly ‘falling’ as it leaves the boiler and heads towards the drain. Note: the access cap on the top end of the tee piece. Finally, “Armaflex” external grade pipe [...]

Urinal Installation

2015-03-21T15:50:59+00:00

Urinal Installation Old cistern, old stainless steel urinal and old tiles were removed. Walls are studded out and plyboarded. Then ‘wet wall’ panelling was fitted before installing the new individual ceramic urinals. New stainless steel pipe work and 2 “ waste supplies installed. The new cistern was also mounted in an adjacent cupboard for a neater appearance and also to prevent tampering. This was controlled by a motion sensor to activate the flush and to save water usage.

Go to Top