Project Description

Urinal Installation

Old cistern, old stainless steel urinal and old tiles were removed.

Walls are studded out and plyboarded. Then ‘wet wall’ panelling was fitted before installing the new individual ceramic urinals. New stainless steel pipe work and 2 “ waste supplies installed.

The new cistern was also mounted in an adjacent cupboard for a neater appearance and also to prevent tampering. This was controlled by a motion sensor to activate the flush and to save water usage.